Podcast: VDC Workflows, Field Realities, and Model Handoffs

Written by
Back to all posts

Augmenta’s Senior Application Engineer, Chris Summers, joined Jared Christman from Big State Electric on Episode #118 of NECA’s Innovation Overload podcast.

The discussion brought together two professionals with deep experience in electrical construction and VDC workflows. Chris spent over 30 years in the electrical industry, including 7 years in VDC, before joining Augmenta.

The conversation focused on familiar challenges across electrical projects, including:

  • The gap between design and field execution
  • Models that are difficult to carry through to installation
  • Coordination issues that surface late in the process
  • The importance of field buy-in

A recurring theme was the disconnect that can occur during handoff. Models are often built for coordination, but not always aligned with how work is actually installed.

The episode also touches on prefabrication workflows, routing decisions, and how teams think about constructability during modeling.

For those working in BIM, VDC, or preconstruction, the discussion reflects many of the realities teams encounter across projects.

You can listen to the full episode here.

Author
Augmenta

Established by a pioneer in Generative Design, Augmenta is an innovative AI firm spearheading enhanced efficiency in the physical industries through automated design solutions. Since its inception in 2018, Augmenta has garnered recognition, including a spot in CB Insights’ AI 100: Most Promising Artificial Intelligence Startups and  Top 50 Generative AI startups in 2023.

Its flagship product, the Augmenta Construction Platform (ACP), aims to ensure sustainable building practices by facilitating energy-efficient design and minimizing waste. The cloud-based system’s first-available module is tailored to electrical contracting firms and automates electrical design processes. ACP Electrical empowers VDC and BIM teams to swiftly create coordinated clash-free electrical systems while reducing modeling timelines from weeks to hours. Augmenta’s innovative system addresses pressing industry challenges, such as schedule pressures and talent shortages, by minimizing the time it takes for multiple iterations and rework.

Read more

Related articles

The future of building design

Learn how your organization can use and benefit from the Augmenta Construction Platform

CONTACT US