CUT BIM TIME
by 60%

with automated electrical
conduit routing and coordination

trusted by INDUSTRY LEADING partners

AUTOMATED 
ELECTRICAL 
ROUTING

ACP (Augmenta Construction Platform) routes and coordinates overhead conduit across entire project scopes in hours, not days. Works with your existing conduit schedules and integrates directly with Revit for easy QA/QC.

Clash-Free Routing

AI-powered generative design platform analyzes Revit models and generates clash-free, constructible conduit routes.

Efficient Layouts

Finds and models the most efficient and supportable routes, optimizing for length, degree of bend, installation time, and cost.

Contractor-Grade

Works on commercial projects of any scale - from elementary schools to large-scale, mission-critical projects like data centers

DESIGN FASTER

VDC teams route, model and coordinate 2.5x faster - getting you ahead of coordination schedules and closer to prefab readiness.

Fully Coordinated

Designs are fully coordinated and clash-free. Rapidly respond to major coordination changes by re-generating new solutions.

Value-EngineerED SOLUTIONS

Explore multiple designs in parallel. Compare material and labor costs. Reduce project cost and schedule while freeing up your VDC team to focus on coordination.

Works with Revit

Easy to deploy - Augmenta's cloud based platform integrates seamlessly into Autodesk Revit. Designs are easy to QA/QC and detail.

MT HOPE ELEMENTARY SCHOOL, DOORS OPENED AUG 2025

"We witnessed remarkable time savings of over 100 hours in the design phase, and our prefabrication-ready drawing time was cut down by a full month. Augmenta is a game-changer for efficiency. It's the next logical step to get fabrication out the door faster and more accurately.”

- Kyle Sponseller, Vice President C&R Electric
SET UP

Import your model directly from Revit

Place and name electrical equipment and fixtures in Revit. Link background models from other trades. Create scope boxes for special design rule areas.

Create, validate, and sync conduit schedules between ACP and Revit. Catch missing equipment and naming errors, and cut reconciliation time from hours to minutes.

Screenshot of Augmenta software platform. Set your requirements
GUIDE

Define requirements and guide solutions

Identify preferred routing pathways by placing routing boxes in Revit. Set project specifications such as spacing, clearances, minimum raceway heights.

Direct ACP's routing the same way you'd direct an a modeller - place routing boxes in Revit for preferred pathways and no-go zones. ACP optimizes for clash avoidance, spacing rules, and code compliance.

Screenshot of Augmenta software platform. Generate and evaluate multiple designs
CREATE

Generate routing solutions

ACP analyzes support locations and penetrability, then generates multiple design alternatives in parallel, coordinating against your background model. Processing happens in the cloud, so your team keeps working.

Compare routes by material cost, bend count, installation time, and labor hours. Run what-if scenarios for copper vs. aluminum, different equipment placements, or layout variations.

Screenshot of Augmenta software platform. Build and iterate.
EXPORT

Evaluate and refine solutions in Revit

Export ACP's solutions directly back into Revit as system conduit. Use in-Revit analysis tools for fast QA/QC and easy editing.

Identify color-coded conduit runs by source, destination, or any ACP parameter for fast review. Export to Revit with schedule data pre-populated, ready for detailing and prefab.

Screenshot of Augmenta software platform. Generate and evaluate multiple designs
proven outcomes

Teams model 3x faster with ACP

Hyperscale
Data Center

  • Manual Estimate: 320 hours
  • ACP Result: 96 hours
  • Complexity: 703 Targets, 693 runs, 110K+ LF
  • Challenge: Utilized ACP  to adapt to multiple mid-stream design changes

Science
Lab

  • Manual Estimate: 125 hours
  • ACP Result: 57 hours
  • Complexity: 10,376ft routed in single generation
  • Challenge: Ran parallel value engineering studies to compare lab layouts

Healthcare
Facility

  • Manual Estimate: 216 hours
  • ACP Result: 103 hours
  • Complexity:16,129ft of overhead conduit
  • Challenge: Got to initial coordination meeting with a fully populated model

“When analyzing our processes, Augmenta provides a solution for aggressive project schedules, scaling teams and minimizing rework in the preconstruction phase of projects.”

Our Pilot Program with Augmenta provided tangible outcomes that we can make business decisions around. Augmenta’s support and engagement during the process was excellent… Augmenta has skilled team members who understand electrical construction.

A differentiator of Augmenta’s Automated Electrical System Design is that the generated solutions are high-enough quality to be sent to coordination and fabrication with very little editing required.

- Adam S. Davis, Sr. Manager of Fabrication & Modularization

PERSONALIZED TRAINING AND SUPPORT

Deploy with Confidence

Initial set-up and ongoing training updates

Get your VDC team up to speed in days, not weeks. Hands-on training for your BIM managers and coordinators, with continuous updates as we release new capabilities.

White-glove support from industry veterans

Our support team has coordinated projects and understands deadlines. Get help from people who know electrical coordination, not just software.

Dedicated application engineer

Your dedicated engineer knows modeling, NEC standards, and how Precon teams work. They ensure smooth Revit integration, and help optimize your workflow across job types.

Comprehensive knowledge base

Detailed docs, videos, and best practices. Find answers for everything from basic setup, to in-depth training, and how to work through complex design scenarios.

WHAT YOU SHOULD KNOW

FAQs

Does ACP work with Evolve, Excel, and SysQue?

Yes. ACP reads your existing conduit schedules, and exports native Revit elements that work with your downstream tools.

What's the learning curve?

Most VDC teams are running projects in ACP within two weeks. We provide hands-on training and don't leave until your team is comfortable.

How accurate are the routes?

ACP generates clash-free routes that account for spacing rules, clearances, and code requirements. You still review and adjust—but you're starting from 90% complete, not 0%.

Will this slow us down while we learn it?

No. Cloud processing means ACP runs in the background while your team keeps modeling. First project might take longer to set up. Second project is faster. By the third, you're ahead.

Can we customize it to our standards?

Yes. You define spacing rules, support methods, clearances, and routing preferences. ACP learns your standards.

What if we're already using another tool?

We've worked with teams transitioning from other coordination platforms. The real question is: does your current tool do automated routing? If not, ACP fills that gap.

UNDER THE HOOD

Built by people who understand the problem

Founded by the pioneers of Generative Design at Autodesk, Augmenta was built to solve one of the hardest problems in building automation: transforming design intent into construction-ready models. This isn't a proof of concept - it's a production-grade platform built on years of R&D. Our founders saw firsthand that the industry needed contractor-grade automation capable of handling real-world complexity.

Protecting your data with enterprise-grade security

Contact us

Interested in automated electrical routing?

Schedule a call to learn how you can cut your BIM time by 60%